![]() | The "Scots" that wis uised in this airticle wis written bi a body that haesna a guid grip on the leid. Please mak this airticle mair better gin ye can. |
Dungeness A Nuclear Power Station | |
---|---|
![]() Dungeness A | |
Kintra | England |
Location | Kent, South East England |
Coordinates | 50°54′50″N 0°57′50″E / 50.913889°N 0.963889°ECoordinates: 50°54′50″N 0°57′50″E / 50.913889°N 0.963889°E |
Status | Decommissioning |
Commission date | 1965 |
Decommission date | 2006 |
Awner(s) | Nuclear Decommissioning Authority |
Operator(s) | Magnox Ltd |
Pouer generation | |
Units decommissioned | 2 X 219 MWe net |
Nameplate capacity | 500 MWe |
Wabsteid www | |
grid reference TR0832016959 |
Dungeness B Nuclear Power Station | |
---|---|
Dungeness B | |
Kintra | England |
Location | Kent, South East England |
Coordinates | 50°54′50″N 0°57′50″E / 50.913889°N 0.963889°E |
Status | Operational |
Construction began | 1965 |
Commission date | 1983 |
Decommission date | Expected 2028 |
Operator(s) | EDF Energy |
Pouer generation | |
Units operational | 2 x 600 MWe (Operating at ~545 MWe net[1] ) |
Nameplate capacity | 1090 MWe |
Wabsteid www | |
grid reference TR0832016959 |
Dungeness nuclear pouer station may refer tae owther ane or baith o a pair o nuclear pouer stations, anerly ane o whilk is still operational, locate on the Dungeness heidland in the sooth o Kent, Ingland.
© MMXXIII Rich X Search. We shall prevail. All rights reserved. Rich X Search